Tanta Mansoura Damietta Rehabilitation Complementary Studies

Egypt
Date: June 2020 - June 2021
Client: ENR - Egyptian National Railway

Project overview

The project involves the:

  • Modernization of the Signalling System between Tanta and Damietta Railway Line (119 km)
  • Duplication of the single-track of El Mansoura – Damietta railway line (65 km)
  • Assess the current conditions of the Tanta-El Mansoura-Damietta railway line
  • Plan for more detailed design
  • Brief analysis/preliminary feasibility study for the electrification of the main Egyptian railway corridors
  • In the preferred design option for Tanta-Damietta, passive provisions for potential future electrification
  • Transport demand analysis
  • Review of cost estimates / Update the economic and financial analysis of the proposed infrastructure
  • Environmental and Social Impact Assessment (ESIA), Environmental and Social Management Plan (ESMP) and Carbon footprint assessment
  • Analysis of institutional and technical capacity of the Promoter.

Our missions

Egis services include for the client include Inception Report, Design and Project Management, Environmental and Social Impact Assessment (ESIA), Environmental and Social Management Plan (ESMP) and Carbon footprint assessment.